THOMASTON
MAYOR J.D. STALLINGS SAYS THE CITY'S WATER/SEWERAGE SYSTEM
CONSULTLANT E.S.G. IS TAKING CORRECTIVE MEASURES AFTER A SEWER
OVERFLOW ON DAVIS LAKE ROAD AREA LAST WEEK. A HIGH PRESSURE
CLEANING OF THE TRUNK LINE IS SLATED FOR FEB. 17TH.
THE
MAYOR SAID 20% OF THE SEWER SYSTEM IS PHOTOED ANNUALLY AS
PREVENTATIVE MAINTENANCE AND SINCE 2016 $9.5 MILLION IN
LOANS AND GRANTS HAVE BEEN DIRECTED TO IMPROVING STORM WATER
AND SANITARY SEWER SYSTEMS. ALSO 100% OF SPLOST PROCEEDS
FROM 2011 AND 2016 REFERENDUMS HAVE BEEN FOR SEWER
UPGRADES.
No comments:
Post a Comment